The Safety Procedure includes:
- General Safety Notes
- Fueling Vehicle
- Storing and Transport Vehicle
- Check Tyre Pressure
- Carrying Cargo on Vehicle
- Operating the Vehicle
- Towing a Trailer
- Risk Ratings
- MS Word Format
- Delivered via email within 2 business hours
|
General Four Wheel Bike Safety Information:
The Safe Work Method Statement outlines the Safety Steps required to operate a Four Wheel Bike Safely.
Four Wheel Bike needs to be used with caution and appropriate safety procedures. The Four Wheel Bike procedure is Not A Blank Template. Safety Procedures can be edited or customised in MS Word if required.
Four Wheel Biker Safety Notes
When Operating A Four Wheel Bike:
- Read all warning labels on the bike.
- The vehicle is designed for off-road use only.
- Ensure there is adequate ventilation when refueling.
- Never store or transport the vehicle tipped up on its rear.
- Check tyre pressure and condition of tyres daily.
|