|
The Cleaning Offices Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre-operational inspection
- Operation
- Maintenance
- Emergency Procedures
Product Details:
- 11 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
|
General Cleaning - Offices Information:
The Cleaning Offices Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure outlining the safety steps for general cleaning in office buildings.
The Cleaning Offices procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Cleaning Offices Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
|
|
Emergency procedures
Chemicals:
Inhalation:
- Remove person into a well ventilated area
- Remove any contaminated clothing
Skin contact:
- Wash with large volume of water
- If blistering, redness or irritation occurs – seek medical attention
Eye Contact:
- Flush eye with water for at least 15 minutes
Ingestion:
- Do not induce vomiting
- Provide water and seek medical attention
Check MSDS for specific instruction and take MSDS with the patient to the Doctor.
Develop and implement an emergency response plan for the site. Include:
- Assembly points
- Communication
- Responsible persons
- Emergency contacts (including nearest medical facility)
- First aid training and equipment
Related Items: Manual Handling
|
|