Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Hedge Trimmer Work Method Statement
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Hedge Trimmer Work Method Statement or Safe Work Procedure

Hedge Trimmer
Hedge Trimmer SWMS
Buy Now

 

The Safety Procedure includes :

  • Operators requirements
  • Transporting
  • Planning
  • Site awareness
  • Preparation fueling
  • Pre-start daily checks
  • Operation
  • On completion
  • General maintenance
  • Risk ratings
  • 5 Page complete procedure
  • MS Word Format
  • Delivered via email within 2 business hours

 

 

General Hedge Trimmer Safety Information :

The five-page Safe Work Method Statement outlines the safety steps required to operate a Hedge Trimmer safely.

Hedge Trimmer needs to be used with caution and appropriate safety procedures. The Hedge Trimmer Procedure is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Hedge Trimmer Safety Notes

When Operating a Hedge Trimmer :

  • Before transporting ensure that: the engine has been shut off, the scabbard has been fitted over the blades, and the trimmer is carried by its front handle.
  • Identify any work that might require cutting above shoulder height. This work should be kept minimal.
  • When refuelling, the trimmer should be placed in a flat clear area, and ensure there are no naked flames.
  • Perform a thorough pre-operational check daily.
  • Take particular care when cutting hedges adjacent to wire fences.  DO NOT touch the wire with the cutting blades.

References:

 

 

University of Minnesota – Hedge Trimmer Safety Paper.
Stihl – Hedge Trimmer Safety Manual.

 




OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012