Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Heights (Working at) Work Method Statement
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Working Safe At Heights Work Method Statement or Safe Work Procedure


Working At Heights

Working At Heights SWMS
Buy Now

 

The Safety Procedure includes :

  • Risk assessment
  • Risk control order
  • Planning
  • Site awareness
  • Preparations
  • Daily checks
  • Site safety
  • Risk ratings
  • 7 Page Complete Procedure
  • MS Word Format
  • Delivered via email within 2 business hours
  • Multiple page document

 

 

General Working At Heights Safety Information :

The seven-page Safe Work Method Statement outlines the safety steps required to Work At Heights safely.

Working At Heights needs to be approached with caution and appropriate safety procedures. The Working Safe At Heights Procedure is not a blank template. Safety procedures can be edited or customised in MS Word if required.

Working At Heights Safety Notes

Before Working At Heights :

  • The equipment being used should be checked for any damage and replaced if so.
  • When required fall arrest scaffolding should be installed around the perimeter of the building.
  • Ladders must be identifiable of commercial quality, and inspected before and after use.
  • Working surfaces must be checked to ensure that they have the strength and structural integrity to safely support workers.

References:

 

 

Tasmania – Play it safe – Working at Heights – A guide to reducing the risk of injury while working.
Queensland – Workplace Health and Safety – Rural Plant Code of Practice 2004.
New South Wales – WorkCover - Safe Working at Heights – Guide 2006.
United States Department of Labor – OSHA – Fall protection.
Safety Culture – Safe Work Procedure – Working on Roofs.
Safety Culture – Safe Work Procedure – Elevating Work Platforms.
Safety Culture – Safe Work Procedure – Ladders – Safe Use.
Safety Culture – Safe Work Procedure – Trestles – Safe Use.
Safety Culture – Safe Work Procedure – Scaffolding.

 




OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012