Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
OHS Systems Work Method
Statements
Safety
Training
OHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Commercial Construction >> Heights (Working at) Work Method Statement
Work Method Statements spacer
1 Residential Construction Procedures
1
Construction Site Safety Management Plan
1
Commercial Construction Industry
  Air Compressor (Portable)
  Antenna and Satellite Installation
  Asbestos Removal - Friable
  Asbestos Removal - Non Friable
1
1   1 Auger
  Backhoe or Front End Loader
1
1   1 Boom Lift
  Brick Laying
  Brick Saw
  Carpet Laying
1
1   1 Cement Render
1
1   1 Circular Saw
1
1   1 Cherry Picker
1
1   1 Cleaning Up Building Sites
1
1   1 Concrete Joining, Sealing & Curing
1
1   1 Concrete Preperation and Laying
1
1   1 Concrete Helicopter
1
1   1 Concrete Pumping
1
1   1 Concrete Sawing
1
1   1 Concrete Vibrator
1
1   1 Confined Spaces
1
1   1 Cornice Fixing
1
1   1 Demolition Work
1
1   1 Docking Saw
1
1   1 Dust Extractor
1
1   1 Electrical Wiring
1
1   1 Epoxy Grout Application
1
1   1 Fuel Storage, Handling, And Decanting
1
1   1 Grinder (Freehand)
1
1   1 Heat Stress
1
1   1 Heights (Safe Working At)
1
1   1 Hitching Mobile Plant To Vehicle
1
1   1 Hiab Crane or Truck Loading Crane
1
1   1 Incident Report Form
1
1   1 Installing Roof Insulation (Batts)
1
1   1 Jack Hammer
1
1   1 Job Safety Analysis
1
1   1 Ladders
1
1   1 Large Excavators
1
1   1 Loading Docks
1
1   1 Lock-Out of Plant and Equipment
1
1   1 Manual Handling (Lifting)
1
1   1 Mini Excavators
1
1   1 Overhead Crane
1
1   1 Oxy Acetylene
1
1   1 Paving
1
1   1 Pedestal Drill
1
1   1 Permit To Work
1
1   1 Pipe Laying (Coiled Pipe)
1
1   1 Plasterboard Fixing
1
1   1 Plasterboard Setting
1   1 Plasterer Stilts
1
1   1 Polyethylene Pipe Butt Welder
1
1   1 Post Hole Digger
1
1   1 Power Tools (Operation)
1
1   1 Pressure Cleaner - electric
1
1   1 Pressure Cleaner - petrol
1
1   1 Roofs (Working On)
1
1   1 Rubbish Removal
1
1   1 Safety Harnesses
1
1   1 Sand Blasting
1
1   1 Scaffolding
1
1   1 Scissor Lift
1
1   1 Steel Construction
1
1   1 Tilt Up Pre-Cast Concrete Panels
1
1   1 Trench Work
1
1   1 Trestles
1
1   1 Trucks (Loading/Unloading)
1
1   1 Tying Rebar
1
1   1 Underground Cable Locating
1
1   1 Vehicle Accident Procedure
1
1   1 Wacker Packer
1
1   1 Waterproofing Bathrooms and Laundries
1
1   1 Welder (Electric)
1
1   1 Working Around Electricity
1
1   1 Construction Site Management
1
1   1 Complete WMS List
1
1 Concrete Safety
1
1 Engineering
1
1 Welding
1
1 Earth Moving
1
1 Industrial Safety
1
1 Electricians
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food and Kitchen Safety
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Working Safe At Heights Work Method Statement or Safe Work Procedure


Working At Heights

Working At Heights SWMS
Buy Now

 

The Safety Procedure includes :

  • Risk assessment
  • Risk control order
  • Planning
  • Site awareness
  • Preparations
  • Daily checks
  • Site safety
  • Risk ratings
  • 7 Page Complete Procedure
  • MS Word Format
  • Delivered via email within 2 business hours
  • Multiple page document

 

 

General Working At Heights Safety Information :

The seven-page Safe Work Method Statement outlines the safety steps required to Work At Heights safely.

Working At Heights needs to be approached with caution and appropriate safety procedures. The Working Safe At Heights Procedure is not a blank template. Safety procedures can be edited or customised in MS Word if required.

Working At Heights Safety Notes

Before Working At Heights :

  • The equipment being used should be checked for any damage and replaced if so.
  • When required fall arrest scaffolding should be installed around the perimeter of the building.
  • Ladders must be identifiable of commercial quality, and inspected before and after use.
  • Working surfaces must be checked to ensure that they have the strength and structural integrity to safely support workers.

References:

 

 

Tasmania – Play it safe – Working at Heights – A guide to reducing the risk of injury while working.
Queensland – Workplace Health and Safety – Rural Plant Code of Practice 2004.
New South Wales – WorkCover - Safe Working at Heights – Guide 2006.
United States Department of Labor – OSHA – Fall protection.
Safety Culture – Safe Work Procedure – Working on Roofs.
Safety Culture – Safe Work Procedure – Elevating Work Platforms.
Safety Culture – Safe Work Procedure – Ladders – Safe Use.
Safety Culture – Safe Work Procedure – Trestles – Safe Use.
Safety Culture – Safe Work Procedure – Scaffolding.

 



Product Updates: First Name * Last Name * Email *

OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES