Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Jigsaw Work Statement
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Jigsaw Safe Work Procedure or Work Method Statement


Jig Saw

Jig Saw SWMS
Buy Now

 

The Safety Procedure includes:

  • Personal Qualifications and Experience
  • Preparation
  • Pre-Start Checks
  • Blade Replacement
  • Operation
  • On Completion
  • General Maintenance
  • 6 Page Complete Procedure
  • MS Word Format
  • Ready To Use
  • Version 4.0

 

 

General Jig Saw Safety Information:

The six page Safe Work Method Statement outlines the Safety Steps required to operate a Jigsaw Safely.

Jigsaw's need to be used with caution and appropiate safety procedures. The Jigsaw procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Jigsaw Safety Notes

Before Operating A Jigsaw:

  • Jig saws should always be used with a safety switch.
  • Ensure the work area is clear of debris. Example – Previous off cuts have been moved to a safe position.
  • Check the trigger switch and Lock-On button operates correctly and does not stick.
  • Check the blade roller guide is adjusted so that it is in slight contact with the rear of the blade.