Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
OHS Systems Work Method
Statements
Safety
Training
OHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Carpentry Industry >> Jigsaw Work Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commerical Construction Industry
1
1 Construction Site Safety Management Plans
1
Carpentry Industry
1 1 Docking Saw
1
1 1 Dust Extractor
1
1 1 Jig Saw
1
1 1 Manual Handling (Lifting)
1
1 1 Rip Saw
1
1 1 Spindle Moulder
1
1 1 Staple Gun
1
1 1 Table Planner
1
1 1 Thicknesser
1
1 1 Wide Belt Sander
1
1 Earth Moving
1
1 Electricians
1
1 Industrial Safety
1
1 Engineering
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Jigsaw Safe Work Procedure or Work Method Statement


Jig Saw

Jig Saw SWMS
Buy Now

 

The Safety Procedure includes:

  • Personal Qualifications and Experience
  • Preparation
  • Pre-Start Checks
  • Blade Replacement
  • Operation
  • On Completion
  • General Maintenance
  • 6 Page Complete Procedure
  • MS Word Format
  • Ready To Use
  • Version 4.0

 

 

General Jig Saw Safety Information:

The six page Safe Work Method Statement outlines the Safety Steps required to operate a Jigsaw Safely.

Jigsaw's need to be used with caution and appropiate safety procedures. The Jigsaw procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Jigsaw Safety Notes

Before Operating A Jigsaw:

  • Jig saws should always be used with a safety switch.
  • Ensure the work area is clear of debris. Example – Previous off cuts have been moved to a safe position.
  • Check the trigger switch and Lock-On button operates correctly and does not stick.
  • Check the blade roller guide is adjusted so that it is in slight contact with the rear of the blade.