The Safety Procedure includes:
- Personal Qualifications and Experience
- Site Awareness
- Pre-Start Checks
- Operation
- On Completion
- General Maintenance
- Risk Ratings
- 4 Page Complete Procedure
- MS Word Format
- This Is Not A Blank Template
- Version 4.0
|
General Linisher Safety Information:
The four page Safe Work Method Statement outlines the Safety Steps required to operate a Linisher – Belt and Disc Sander Safely.
Linisher's need to be used with caution and appropiate safety procedures. The Linisher – Belt and Disc Sander procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
Linisher Safety Notes
Before Operating A Linisher:
- Ensure the area around linisher is clear of obstructions and the floor is free from dust.
- All guards must be in-place. Linisher face guards must be clean and in place.
- The Linisher should be firmly bolted to the ground. (This ensures that the linisher will not topple over and should reduce the noise level.)
- Locate and ensure you are familiar with the operation of the ON/OFF starter and the E-Stop.
|