|
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Inspection
- Operation
- Emergency Procedures
- References
- 5 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- E-mailed out
|
Loading Docks Information:
The Loading Docks Safe Work Method Statement (SWMS) is a comprehensive 5 page procedure outlining general considerations for Loading Docks.
The Loading Docks procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Loading Docks procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
Planning
Develop written safety instructions/rules for use of loading bays. Include:
- Traffic management
- Loading dock rules
- Instructions for drivers
- Types of equipment in use
- Acceptable practices and types of vehicles
- No pedestrian policy
- Emergency procedures
- Other items as required
Ensure all persons (including operators, drivers and the companies that drivers work for) are provided with these instructions , and an adequate induction before using loading docks.
Related Items: Manual Handling
References:
- OHS Legislation in all States
- WorkSafe WA (2009) Forklifts and Loading Docks
- WorkSAfe SA (2005) Loading Docks Safety Solutions
- WorkSAfe SA (2005) Falls Prevention in Transport Industry
- AS 1657-1992 Fixed Platforms, Walkways, Stairways and Ladders –
Design, Construction and Installation
- AS 2359.2 – 1985 SAA Industrial Truck Code
|