Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Motor Grader Operation Work Method Statement
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Motor Grader Operation Work Method Statement or Safe Work Procedure


Motor Grader

Motor Grader SWMS
Buy Now

 

For information on licensing requirements under the Harmonised WHS Laws, click here.

The Safety Procedure includes :

  • Operators requirements
  • Significant risks
  • Site awareness
  • Transporting
  • Conduct routine checks
  • Access
  • Seat adjustment
  • Starting
  • Operating
  • Site safety
  • Completion
  • Refueling
  • General maintenance
  • Risk ratings
  • 8 Page Complete Procedure
  • MS Word Format
  • Multiple page document
  • Delivered via email within 2 business hours

 

 

General Motor Grader Safety Information :

The eight page Safe Work Method Statement outlines the Safety Steps required to operate a Motor Grader Safely.

Motor Grader needs to be used with caution and appropriate safety procedures. The Motor Grader procedure is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Motor Grader Operation Safety Notes

Before Operating A Motor Grader:

  • Where required the site should be barricaded off to ensure the public is not placed in harms way.
  • The grader must be operated in accordance with statutory regulations at all times (e.g. while being driven on roads).
  • Check for visual evidence of structural weaknesses such as paint separation and/or weld stress.
  • Ensure the seat is locked in position and cannot rotate unless released by the operator.

References:

 

 

Queensland – Workplace Health and Safety Regulations 1997.
Queensland – Department of Industrial RelationsOperate a grader – Units of Competency - Code OHSCER217A.
West Australia – Worksafe - Safety and Health Alert – Worker killed by reversing grader.
Victoria - WorkSafe – Construction and Utilities Program Incident Report – Grader Collision with Train at Level Crossing.

 




OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012