Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
OHS Systems Work Method
Statements
Safety
Training
OHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Carpentry Industry >> Nail Gun (Pneumatic) Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commerical Construction Industry
1
1 Construction Site Safety Management Plans
1
Carpentry Industry
1 1 Docking Saw
1
1 1 Dust Extractor
1
1 1 Jig Saw
1
1 1 Manual Handling (Lifting)
1
1 1 Rip Saw
1
1 1 Spindle Moulder
1
1 1 Staple Gun
1
1 1 Table Planner
1
1 1 Thicknesser
1
1 1 Wide Belt Sander
1
1 Earth Moving
1
1 Electricians
1
1 Industrial Safety
1
1 Engineering
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Nail Gun (Pneumatic) Work Method Statement or Safe Work Procedure


Nail Gun

Nail Gun SWMS
Buy Now

 

The Safety Procedure includes:

  • Personal Qualifications and Experience
  • Site Awareness
  • Pre-Start Checks
  • Loading The Nail Gun - Clearing A Jam
  • Operation
  • On Completion
  • Close Down
  • Risk Ratings
  • 7 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

 

 

General Pneumatic Nail Gun Safety Information:

The seven page Safe Work Method Statement outlines the Safety Steps required to operate a Nail Gun - Pneumatic Safely.

Nail Gun's need to be used with caution and appropiate safety procedures. The Nail Gun - Pneumatic procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Nail Gun - Pneumatic Safety Notes

Before Operating A Nail Gun:

  • Clearly display one or more warning signs that nail guns are in use.
  • Ensure all air hoses are located where they will not be damaged. Example: - not across walkways.
  • Employers/foremen/principal contractors monitor the use of the nail guns to ensure that the safe systems of work are being maintained by the operators.
  • The Nail Gun must be inspected before being connected to the air supply hose.

References:

 

 

State - Occupational Health and Safety Act.
State - Occupational Health and Safety Regulations.

Victoria – Worksafe – Alert - Nail gun injuries are avoidable.
Queensland – Department of Industrial Relations - Safety Alert - Safe use of nailing tools (nail guns).
Western Australia - Department of Employment and Consumer Protection – Nailing tools.

National Training Information Service - NTIS – LMFFM1002A: Operate basic woodworking machines.
Training And Further Education - Timber and power tools - NSW Module Number 2149B.

University of Florida – Environmental Health and Safety – Compressed Air Safety.
Canadian Centre for Occupational Health and Safety - Pneumatic Tools - Basic Safety.
Canadian Centre for Occupational Health and Safety – Pneumatic Nailing and Stapling Tools.

SafetyCulture – Safe Work Procedure – Air Compressor – Small Electric.

 



Product Updates: First Name * Last Name * Email *

OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES