The Safety Procedure includes:
- Risk Assessment
- Operators Requirements
- Planning
- Daily Pre-Start Checks
- General Safety Requirements
- Preparation
- Operation
- On Completion
- Risk Ratings
- 5 Page Complete Procedure
- MS Word Format
- This Is Not A Blank Template
- Version 4.0
|
General Overhead Crane Safety Information:
The five page Safe Work Method Statement outlines the Safety Steps required to operate an Overhead Crane Safely.
Overhead Cranes need to be used with caution and appropiate safety procedures. The Overhead Crane procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
Overhead Crane Safety Notes
Before Operating An Overhead Crane:
- No person shall operated the crane unless they are trained to do so.
- Locate the power disconnection switch, always ensure the access to the switch is not blocked.
- Operators must inspect all equipment daily before use.
- Ensure the rated load capacity of the crane, hoist, chain, cable, slings, or other components will not be exceeded.
- Personnel are to, and will remain clear of the load at all times.
|