Planning
Designate a suitable area for unit. Eg:
- Flat, even floor surface with no trip/fall risks
- Adequate lighting and ventilation
- Sufficient space/ operator room.
- Separated from other operations (such as spray painting, mobile plant, welding and other hot works
- Clear of electrical switchboards, outlets, power cords etc
- Away from storm water drains or water ways
- Ensure Material Safety Data Sheets (MSDS) are available/ accessible at site for all paints/chemicals (Part A and B).
|
Painting Enviro Wash Safe Information:
The Painting Enviro Wash Safe Work Method Statement (SWMS) is a comprehensive 5 page procedure outlining the steps for safe use of a Dulux Mobile Enviro Wash ES 450
This SWMS covers the use of the Dulux Mobile Enviro Wash (ES 450) for painting equipment clean-up. This does not include the process of painting, etc and assumes the clean-up will take place in an outdoor/well ventilated environment.
The Painting Enviro Wash Work Method Statement is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Painting Enviro Wash procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
References:
- OHS legislation in all States
- Worksafe Victoria, 2007. Machinery and Equipment Safety – An Introduction
- QLD DEIR (2005) Building and Construction Industry Safety Guide
- QLD DEIR – General Construction Induction Training (online information)
- WorkSafe Victoria Code of Practice – Manual Handling
- Dulux Trade Environmental Wash System, Product Brochure 2007.
- Dulux Envirowash System Brochure.
|