The Safety Procedure includes:
- PCP
- Risk Assessment
- Pre-start Checks
- Commence Pipe Bending Operation
- Completion
- Risk Ratings
- 4 Page Complete Procedure
- MS Word Format
- This Is Not A Blank Template
- Version 4.0
|
General Pipe Bender Safety Information:
The four page Safe Work Method Statement outlines the Safety Steps required to operate a Pipe Bender Safely.
Pipe Bender's need to be used with caution and appropiate safety procedures. The Pipe Bender procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
Pipe Bending Safety Notes
When Operating A Pipe Bender:
- Clear the work area of all unwanted and unnecessary metal pieces.
- Lock off the hydraulic bleeder.
- Keep both hands well clear of the area between the die and rollers.
- To remove the pipe, release the hydraulic pressure.
- Remove the handle from the machine and store properly.
|