The Safety Procedure includes:
- Employee Requirements
- Transporting
- Planning
- Site Awareness
- Preparation
- Quality Control
- Manual Handling
- Operation
- Site Safety (End Of Shift)
- Risk Ratings
- 6 Page Complete Procedure
- MS Word Format
- This Is Not A Blank Template
- Version 4.0
|
General Pipe Laying (Coiled Pipe) Safety Information:
The six page Safe Work Method Statement outlines the Safety Steps required When Pipe Laying (Coiled Pipe) Safely.
Pipe Laying need to be used with caution and appropiate safety procedures. The Pipe Laying (Coiled Pipe) procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
Pipe Laying (Coiled Pipe) Safety Notes
When Pipe Laying (Coiled Pipe):
- Sand is to be placed in the trench by a backhoe.
- Minimise waiting time for pipes on site prior to laying.
- Place pipes in a secure compound “lay down” area when left unattended.
- Check pipe for defects before laying into trench.
- The coiled pipe should uncoil easily using the rigid pipe as a virtual axel.
|