The Safety Procedure includes:
- Risk Assessment
- Preparation
- Operation
- Completion
- Emergency Procedures
- Risk Ratings
- 4 Page Complete Procedure
- MS Word Format
- This Is Not A Blank Template
- Version 4.0
|
General Plasma Cutter Safety Information:
The four page Safe Work Method Statement outlines the Safety Steps required to operate a Plasma Cutter Safely.
Plasma Cutters need to be used with caution and appropiate safety procedures. The Plasma Cutter procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
Plasma Cutter Safety Notes
Before Operating A Plasma Cutter:
- Keep a fire extinguisher nearby and have a watch person This Is Not A Blank Template it.
- Use ventilation fans to remove the fumes.
- Do not hold the material near the cutting path.
- Remove grease and all surface coatings first, unless they are ment to be welded or cut through.
- Check for gas leaks.
- Turn off power before dissassembling torch.
|