|
Planning
Inspect intended work area. Check:
- Underground services/utilities (Dial before you dig)
Type of soil (wet, dry, compact etc)
- Suitable driver capacity (light, heavy duty etc)
- Suitable for number of poles required (for large jobs – use pneumatic.)
- Posts are suitable for type of driver.
- Rocks, tree roots etc.
- Weather conditions
- Lighting
- Cliffs, pits, drop-offs etc.
Product Details:
- 9 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- E-mailed out
Related Items: Manual Handling
|
Post Driver Information:
The Post Driver Safe Work Method Statement (SWMS) is a
comprehensive 9 page procedure outlining the steps for safe
operation of a Post Driver.
This SWMS covers the use of pneumatic and manually-operated
post drivers (star-picket drivers). This does not include
tractor-mounted drivers.
The Post Driver procedure is ready to use and is not a blank
template. Simply add your company details, ABN, and include
any site specific details or risks and make it specific to
the task at hand. It is then ready for printing and to be
incorporated as part of your overall OHS System.
The Post Driver (pneumatic and hand held) procedure can be
used as part of your OHS inductions, for Tool box talks or
tender applications.
References:
- OHS Legislation in all States
- Safe Work WA (2009). Post Drivers – Industry Safety Standard
- Safe Work Australia – National Code of Practice for the Prevention of
Musculoskeletal Disorders Caused From Performing Manual Tasks.
- WorkSafe Victoria (2008) First Aid in the workplace - Compliance Code.
|