The Safety Procedure includes:
- Risk Assessment
- Pre-Start Checks
- Safely Parking
- Attatching Hydraulic Hoses
- Travelling To Job Site
- Aligning The Digger
- Operation
- Inspection
- Risk Ratings
- 6 Page Complete Procedure
- MS Word Format
- This Is Not A Blank Template
- Version 4.0
|
General Post Hole Digger Safety Information:
The six page Safe Work Method Statement outlines the Safety Steps required to operate a Post Hole Digger Safely.
Post Hole Diggers need to be used with caution and appropiate safety procedures. The Post Hole Digger procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
Post Hole Digger Safety Notes
Before Operating A Post Hole Digger:
- Check the hydraulic hose and repair or replace if necessary.
- Reverse the tractor and safely park near the digger/knocker.
- Connect the PTO, Digger and Hoses to the tractor.
- Always keep a safe distance between the moving tractor and the 2nd operator.
- Clean the hole and auger, with the auger being raised while rotating.
|