The Safety Procedure includes:
- Operators Requirements
- Site-Awareness
- Preparation
- Fitting New Blades
- Operation
- On Completion
- General Maintenance
- Risk Ratings
- 4 Page Complete Procedure
- MS Word Format
- This Is Not A Blank Template
- Version 4.0
|
General Rip Saw Safety Information:
The four page Safe Work Method Statement outlines the Safety Steps required to operate a Rip Saw Safely.
Rip Saw's need to be used with caution and appropiate safety procedures. The Rip Saw procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
Rip Saw Safety Notes
When Operating A Rip Saw:
- No person is to use the Rip Saw unless they are trained bya relevant person.
- Use ear muffs and goggles at all times.
- Do not wear loose clothing or jewellery.
- Check and adjust all safety devices.
- Tighten the nut with an even pressure.
|