Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Rock Saw (Wheel) Excavator Use Work Method Statement
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Rock Saw (Wheel) Excavator Use Work Method Statement or Safe Work Procedure


Rock Saw
Image from Rock Tools, Inc

Rock Saw SWMS
Buy Now

 

The Safety Procedure includes:

  • Personal Qualifications and Experience
  • Transporting
  • Planning
  • Site Awareness
  • Preparation
  • Pre-Start Checks
  • Operation
  • On Completion
  • Risk Ratings
  • 7 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

 

 

General Rock Saw Safety Information:

The seven page Safe Work Method Statement outlines the Safety Steps required to operate a Rock Saw Safely.

Rock Saw's need to be used with caution and appropiate safety procedures. The Rock Saw procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Rock Saw Safety Notes

Before Operating A Rock Saw:

  • To prevent damage to the saw it must always be transported inside its storage frame.
  • The saw blade while cutting rock can expel debris for several metres.
  • Ensure all personnel are aware of the safety zone to be maintained around the saw while in operation.
  • The saw may be supplied with two mounting positions, one for extended reach.

References:

 

 

Australia – NTIS – National Training Information Service - BCCPO3003B: Conduct excavator operations.
New South Wales – WorkCover – A Guide for Front End Loaders and Excavator Drivers 1994.

United States - NIOSH (National Institute for Occupational Safety and Health) Publication No. 2004-107: Preventing Injuries When Working with Hydraulic Excavators and Backhoe Loaders.

Hong Kong – Labour Department - Code of Practice in the Safe Use of Excavators.

Hydrapower - Operation Manual for Profilers.
SafetyCulture - Safe Work Procedure – Excavator – Large.

 




OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012