Table Planer Safe Work Method Statement includes:
- Risk Assessment
- Operators Requirements
- Safety Awareness
- Replacing Planer Blades
- Operation
- On Completion
- General Maintenance
- Emergency Procedures
- Risk Ratings
- 5 Page Complete Procedure
- MS Word Format
- This Is Not A Blank Template
- Version 4.0
|
General Table Planer Safety Information :
The five page Safe Work Method Statement outlines the Safety Steps required to operate a Table Planer Safely.
Table Planers need to be used with caution and appropiate safety procedures. The Table Planer procedure is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
Table Planer Safety Notes
Before Operating A Table Planer :
- Use earmuffs and goggles at all times.
- Wear dust mask if operation produces dust.
- Do not wear loose clothing or jewellery.
- Isolate power supply to the machine when replacing the Planer blade.
- Place the workpiece flat on the table top.
- Always ensure that the tool is switched off and unplugged before attempting to perform inspection or maintenance.
|