The Safety Procedure includes:
- Operators
Requirements
- Site Awareness
- Pre-Start Daily Checks
- Preparation - General
- Preparation - Dust Extractor
- Operation
- On Completion
- General Maintenance
- Risk Ratings
- 6 Page Complete Procedure
- MS Word Format
- This Is Not A Blank Template
- Version 4.0
|
General Table Saw Safety Information:
The six page Safe Work Method Statement outlines the Safety Steps required to operate a Table Saw Safely.
Table Saw's need to be used with caution and appropiate safety procedures. The Table Saw procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
Table Saw Safety Notes
Before Operating A Table Saw:
- Always ensure all keys and adjusting wrenches are removed from the saw.
- Check blade to ensure the correct one has been selected and installed. (Refer to manufacturer’s specifications.)
- Confirmation of individuals training to be sighted prior to commencement of use of any table saw.
- Ensure that the fence is parallel to the saw blade. If not the work could jam on the blade.
|