Tying Rebar Safe Work Method Statement includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Preoperational inspection
- Operation
- Maintenance
- Emergency Plan
- References
- Diagrams
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
|
Tying Rebar Safe Work Method Statement:
The Tying Rebar Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for rebar tying from ground level. The Rebar Tying procedure is ready to use and is not a blank template.
Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.
It is then ready for printing and to be incorporated as part of your overall OHS System. The Tying Rebar procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
Preparation for Tying Rebar:
Ensure:
- all protruding rebars are capped
- correct rebar-cap for the size of the bar
- rebar-caps fitted in accordance with the supplier's instructions
- condition of the rebar-caps checked regularly for deterioration/damage
- regular checks that the rebar-caps are still in place and correctly fitted
|