Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Concrete Safety >> Concrete Helicopter Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commerical Construction Industry
1
1 Construction Site Safety Management Plans
1
Concrete Safety
1 1 Circular Saw (Handheld)
1
1 1 Cement Mixer
1
1 1 Concrete Crusher
1
1 1 Concrete Joining, Sealing & Curing
1
1 1 Concrete Preperation and Laying
1
1 1 Concrete Form Work
1
1 1 Concrete Helicopter
1
1 1 Concrete Pumping
1
1 1 Concrete Rendering
1
1 1 Concrete Sawing
1
1 1 Concrete Vibrator
1
1 1 Cut-off Metal Saw
1
1 1 Dust Extractor
1
1 1 Fuel Storage, Handling and Decanting
1
1 1 Grinder (Freehand)
1
1 1 Heights (Working at)
1
1 1 Incident Report Form
1
1 1 Heat Stress
1
1 1 Jack Hammer
1
1 1 Job Safety Analysis Worksheet
1
1 1 Manual Handling (Lifting)
1
1 1 Power Tools (Operation)
1
1 1 Scaffolding
1
1 1 Tilt-up Precast Concrete Panels
1
1 1 Traffic Management and Roadside Construction Guidelines
1
1 1 Tying Rebar by Machine or Manually
1
1 1 Wacker Packer
1
1 1 Complete WMS List
1
1 Earth Moving
1
1 Electricians
1
1 Industrial Safety
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Engineering
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
Cleaning Industry
Handyman
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Concrete Helicopter Work Method Statement or Safe Work Procedure


Concrete Helicopter

Concrete Helicopter SWMS
Buy Now

 

The Safety Procedure includes:

  • PPE
  • Operators requirements
  • Transportation
  • Planning
  • Preparation and Site Awareness
  • Pre commencement checks
  • Operation
  • On completion
  • References
  • Risk Ratings

Product Details:

  • 12 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

 

General Concrete Helicopter Safety Information:

The Concrete Helicopter Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure outlining the safety steps for use of a Concrete Helicopter.

The Concrete Helicopter procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Concrete Helicopter procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

Concrete Helicopters (Also referred to as Power Trowels, Cement Trowels, Helicopters / Choppers or Cement Floats) can be either petrol or electrically powered.

Concrete Helicopter Pre Commencement Checks

  • Place the Power Trowel within close proximity to the work area.

Undertake a final check of:

  • All relevant PPE;
  • The Power Trowel ( check the condition of the blades & ensure guard is fitted)
  • Work area.

On completion of trowelling activities ensure:

  • Unit / Power is turned off and disconnected;
  • Allow Trowel sufficient time to cool down prior to handling;
  • Thoroughly wash all concrete product off unit and blades;
  • Remove any waste created during activity






OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012