The Safety Procedure includes :
-
9 page complete procedure
-
MS Word Format
-
Easy to add site details and risks
-
Delivered via email within 2 business hours
-
This is not a blank template
-
Multiple page procedure
|
General Insulation Batts Safety Information :
The Installation of Batts Insulation Safe Work Method Statement is a 9 page Safety Procedure covering the steps involved in installing batt insulation into the ceilings of new and existing homes.
It covers the risks involved and control measures to counter those risks.
Before Installing Roof Insulation :
- Ensure all equipment and bags of batt are secured before transporting.
- Determine/Locate any previously installed cabling, heat sources, lights etc.
- Do not work for long periods above shoulder height.
- Use a knife to cut the batts to the desired size.
|