The Pallet Jack Safety Procedure includes:
- PPE
- Safety Notes
- Operators Requirements
- Activity Preparation
- Pre Operational Checks
- Operation
- On Completion
- References
- 4 page complete procedure
- Microsoft Word Format
- Easy to add site specific details and risks
- Version 5.0
|
General Pallet Jack Safety Information:
The Safe Use of a Manual Pallet Jack Safe Work Method Statement (SWMS) is a comprehensive 4 page procedure outlining the safety steps for operating a Pallet Jack.
The Pallet Jack SWMS is a This Is Not A Blank Template procedure and not a blank template. Simply add your company details and add any site specific details or risks. It is then ready for printing and to be incorporated as part of your overall OHS System.
When Operating A Pallet Jack:
- Ensure the work area is set up to protect exposure to moving vehicles
- Ensure that all pallets to be used are checked and in safe condition
- Ensure the unloading area is set up to reduce interaction of vehicles and pedestrians
- Never turn a loaded pallet jack across a slope or whilst moving as this will most likely cause the load to fall.
|