The Safety Procedure includes:
- PPE
- Operators requirements
- Transportation
- Planning
- Preparation and Site Awareness
- Pre commencement checks
- Concrete drilling
- Operation
- On completion
- References
- Risk Ratings
- 8 page complete procedure
- MS Word Format
- Easy to edit
- Easy to add site specific risks
- Version 5.0
|
Installation of Suspended Sanitary Waste by plumbers requires Appropriate Safety Procedures to be used.
This 8 page Suspended Sanitary Waste Work Method Statement outlines the risks or hazards and the control measures for Suspended Sanitary Waste.
The document can be used as part of an Induction Process, submitted with a tender or simply implemented into your existing OHS System.
Suspended Sanitary Waste is the plumbing process of laying the suspended PVC waste piping to multi level premises or on the roof of concrete basements. All Plumbers installing Sanitary Waste are required to implement a Safe Work Method Statement.
Additional Safety Notes
When Plumbing Hot and Cold Water Rough In:
- Ensure all materials (including ladders / pipes) are appropriately secured to roof racks when transporting.
- Ensure all equipment is positioned to reduce manual handling but also to avoid clutter / congestion.
- Only handle loads that are manageable.
- Ensure adequate ventilation is available within work area.
|