|
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Operation
- References
Product Details:
- 4 page procedure
- MS Word format NOT PDF
- Add site specific details and risks
- Make it task specific
-
Instant download delivery
|
Working Around Plant or Machinery on a Construction Site Information:
The Working around plant or machinery on a construction site Safe Work Method Statement (SWMS) is a comprehensive 4 page procedure outlining the safety steps for persons (other than construction employees) conducting work in close proximity to heavy machinery at construction sites.
The Working around plant or machinery on a construction site procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Working around plant or machinery on a construction site procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
Planning
Liaise with Principal Contractor. Ensure following is provided before work commences:
- Site specific induction (include location of amenities, first aid facilities, emergency plans and evacuation points, incident reporting, communication, contact persons etc)
- Health and Safety Rules for site
- Supervisory arrangements
- PPE requirements for site (hard hat, high visibility clothing, safety boots, etc)
- Types of hazards at site
- Site plans – showing no go zones for pedestrians
- Traffic Management plans
- Relevant SWMS and JSA's
- Site security requirements
|