Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Playground with soft-fall surface and big green trees

Soft-fall Surface Removal and Installation Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Soft-fall Surface Removal and Installation Safe Work Method Statement

This Soft-fall Surface Removal and Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal and preparation and laying of wet pour rubber (softfall surfacing) on various surfaces.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Soft-fall Surface Removal and Installation SWMS:

(includes potential hazards & control measures)

  1. Working Outdoors
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Working with Powered & Non-powered Tools
  8. Synthetic Grass/Rubber Removal
  9. Setting-out/Profiling Building Lines, Subgrade Preparation & Spreading Fill
  10. Mixing Wet Pour Rubber
  11. Application & Finishing
  12. Fuelling Small Engines On-site
  13. On Completion
  14. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Soft-fall Surface Removal and Installation Safe Work Method Statement

This Soft-fall Surface Removal and Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal and preparation and laying of wet pour rubber (softfall surfacing) on various surfaces.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Soft-fall Surface Removal and Installation SWMS:

(includes potential hazards & control measures)

  1. Working Outdoors
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Working with Powered & Non-powered Tools
  8. Synthetic Grass/Rubber Removal
  9. Setting-out/Profiling Building Lines, Subgrade Preparation & Spreading Fill
  10. Mixing Wet Pour Rubber
  11. Application & Finishing
  12. Fuelling Small Engines On-site
  13. On Completion
  14. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View