Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Trench Collapse – Emergency Response SWMS

Trench Collapse – Emergency Response SWMS

Product SKU: 10094
Trench Collapse – Emergency Response SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word and IAT (iAuditor App) format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

The Trench Collapse Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls in the event of a trench collapse.

Specific procedures must be implemented that are site specific and relevant to the nature of the collapse and the urgency of the rescue (e.g.: life-saving response). All precautions must be taken to ensure that a trench collapse will not occur. Always ensure area is made safe for rescue personnel.

Trench collapses can occur from unstable soil and inadequate shoring. It is important to note that any rescue action may act to disrupt the temporary stability of the trench and cause further collapse.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at. 

Document Format
This Safe Work Method Statement (SWMS) is provided in the following document formats 

 

iat-word-files.jpg

 

app-store-badge.png google-play-badge.png

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

Related Items:

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...