Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Electrical cables installed on roof

Electrical New Installation Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Electrical New Installation Safe Work Method Statement

This SWMS electrical Installation covers hazards and controls associated with electrical work. If you’re looking for a safe way to complete your electrical installation, then look no further.

 The Electrical Installation Safe Work Method Statement (SWMS) allows you to include information about relevant legislation, codes of practice and other guidance material for work involving electrical equipment or systems.

Essential when working with wiring, switches and circuit breakers, this SWMS will cover your low-voltage electrical safety needs when working on a premise.

You will save time by having everything you need at hand without doing hours upon hours of research yourself! All while staying up-to-date with current standards and regulations!

Plus, there's better news - Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in the Electrical New Installation SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Obtain Supply Authority Certificates
  3. Arrival On-site & Assess On-site Conditions
  4. Working Outdoors
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Working with Powered & Non-powered Tools
  10. Hazardous Substance/Chemical Use
  11. Working at Height on Ladders
  12. Working On or Near Energised Electrical Installations or Services
  13. Excavating, Backfilling & Underground Lead-in
  14. Electrical Lead-in (overhead)
  15. Running Conduit
  16. Switchboard Installation, Test & Commission Confirming Phase Rotation of all 3-Phase Equipment
  17. Fitting Appliances & Fixtures
  18. Test & Commission
  19. On Completion
  20. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Electrical New Installation Safe Work Method Statement

This SWMS electrical Installation covers hazards and controls associated with electrical work. If you’re looking for a safe way to complete your electrical installation, then look no further.

 The Electrical Installation Safe Work Method Statement (SWMS) allows you to include information about relevant legislation, codes of practice and other guidance material for work involving electrical equipment or systems.

Essential when working with wiring, switches and circuit breakers, this SWMS will cover your low-voltage electrical safety needs when working on a premise.

You will save time by having everything you need at hand without doing hours upon hours of research yourself! All while staying up-to-date with current standards and regulations!

Plus, there's better news - Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in the Electrical New Installation SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Obtain Supply Authority Certificates
  3. Arrival On-site & Assess On-site Conditions
  4. Working Outdoors
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Working with Powered & Non-powered Tools
  10. Hazardous Substance/Chemical Use
  11. Working at Height on Ladders
  12. Working On or Near Energised Electrical Installations or Services
  13. Excavating, Backfilling & Underground Lead-in
  14. Electrical Lead-in (overhead)
  15. Running Conduit
  16. Switchboard Installation, Test & Commission Confirming Phase Rotation of all 3-Phase Equipment
  17. Fitting Appliances & Fixtures
  18. Test & Commission
  19. On Completion
  20. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View