Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

OSHE Site Management Plan - Subcontractor 20201-1

OSHE Site Management Plan - Subcontractor 20201-1

Product SKU: 20201
OSHE Site Management Plan - Subcontractor 20201-1 Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download Delivery
    • Provides a framework to manage the implementation of work health and safety for work being perfromed by contract workers, engaged by Principal Contractors
    • Suitable for subcontractors reporting to Principal Contractors 
    • Designed to assist you meeting Western Australian legislative conformance
    • Subcontractor Site Management Plan includes an integrated environmental plan
OSHE Subcontractor Site Management Plan
Subcontractors are a critical section of the industry who can make a real difference to improving OSHE on building and construction sites. This plan outlines effective Subcontractor Site Management, particularly in relation to arrangements for OSHE planning, inspections and most importantly, risk management.
 
Key Features:
  • Contractor Management
  • Emergency Management
  • OSH Entry Permits
  • Integrated OSH and Environmental Policy 

 

Written to align with key elements from:

  • Current Occupational Safety and Health Act & Regulations for Western Australia
  • Australian Government (1999): Commonwealth Environment Protection and Biodiversity Conservation Act
  • ISO 14001:2004: Environmental management systems – Requirements with guidance for use
 
Table of Contents

Distribution Record

Amendment Record

Introduction

Review Procedure

Document Control

Management Commitment and Approval

1             Occupational Health Safety and Environmental Policy

2             Project Details

3             Six Stage Commitment to OSHE

3.1       Consultation, Cooperation and Coordination

3.1.1    SHE Organisational Roles, Responsibilities and Authorities

3.2       Hazard Identification and Risk Management

3.2.1    Electrical Safety

3.2.2    Plant and Equipment

3.2.3    Lock out/Tag out (LOTO)

3.2.4    Contractor Management

3.2.5    Falls Prevention

3.2.6    Excavation

3.2.7    Hazardous Substances

3.2.8    Noise and Vibration

3.2.9    Air Quality

3.2.10      Terrestrial Fauna

3.2.11      Native Vegetation and Weeds

3.2.12      Cultural Heritage

3.2.13      Erosion and Sediment

3.2.14      Waste

3.2.15      Acid Sulphate Materials (ASM)

3.2.16      Environmental Site Assessment Checklist

3.3       Information, Training and Instruction

3.3.1    Site Safety Rules

3.4       Incident and Emergency Management

3.4.1    Incident Management

3.4.2    Notifiable Incidents

3.4.3    Emergency Management

3.4.4    First Aid

3.1       High-Risk Construction Work

3.2       Monitoring

4             OSH Entry Permits

5             Return to Work (RTW)

6             Regulatory Authorities

Appendix 1: Safety Meeting/Toolbox Talk Record

Appendix 2: Risk Register

Appendix 3: Risk Assessment Form

Appendix 4: JSA

Appendix 5: Hazard Report Form

Appendix 6: Worksite Inspection Checklist (daily)

Appendix 7: Worksite Inspection Checklist (weekly)

Appendix 8: Worksite Inspection Checklist (monthly)

Appendix 9: Excavation Safety Inspection Checklist

Appendix 10: Electrical Safety Checklist

Appendix 11: Electrical Equipment Register

Appendix 12: Plant & Equipment Register/Maintenance Log

Appendix 13: Employee/Employee Training, Competency and Induction Register

Appendix 14: Plant Hazard Checklist (powered mobile plant)

Appendix 15: Plant Hazard Checklist (non-mobile plant)

Appendix 16: Plant Risk Assessment Form

Appendix 17: PPE Register

Appendix 18: Isolation Permit to Work

Appendix 19: SWMS Checklist

Appendix 20: Contractor Spot Inspection Form

Appendix 22: Non-conformance Report

Appendix 22: Incident Report Form

Appendix 23: Falls Prevention Checklist

Appendix 24: Falls Emergency Rescue Plan

Appendix 25: Hazardous Substances/Substances – Dangerous Goods Register

Appendix 26: Site Induction Checklist

Appendix 27: Incident/Near Miss/Hazard Report Register

Appendix 28: SWMS Template

Appendix 29: SWMS Register

Terms and Definitions

References

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$195.00

PLUS GST

View Cart


You May Also Need...