Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Abrasive Blasting and Coating SWMS 10230-4

Abrasive Blasting and Coating SWMS 10230-4

Product SKU: 10230
Abrasive Blasting and Coating SWMS 10230-4 Video

Other Details

PDF Download:
abrasive_blasting_and_coating_swms_10230-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Abrasive Blasting & Coating Safe Work Method Statement

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the general use of Abrasive Blasting (Dry Air Powered) and coating. This includes planning, working near powered mobile plant, working on scaffolding, trestles and platform ladders. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

 

Abrasive Blasting & Coating SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Work in an area that may have a contaminated or flammable atmosphere
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Arrival & site assessment
    • Work area set up
    • Blasting
    • Coating
    • On Completion
    • Record Keeping/ Health Monitoring
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...