Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Air Conditioning (Ducted New Construction) SWMS 10005-7

Air Conditioning (Ducted New Construction) SWMS 10005-7

Product SKU: 10005
Air Conditioning (Ducted New Construction) SWMS 10005-7 Video

Other Details

PDF Download:
air_conditioning_ducted-new_construction_swms10005-7__SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Download via Email on order completion.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Instructions on customisation provided.
    • Complies with current legislation in all Australian States/Territories and New Zealand.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Air Conditioning (Ducted New Construction) SWMS | Safe Work Method Statement

This Air Conditioning (Ducted New Construction) Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with new ducted air-conditioning system installations in buildings under construction. 

Job Steps covered in Air Conditioning (Ducted New Construction) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Assess On-site Conditions
  4. Work Area Set-up
  5. Materials Delivery
  6. Outdoor/Indoor Units
  7. Installing Ductwork & Refrigerant Lines
  8. Joining Refrigerant Lines
  9. Electrical Fit-off
  10. Commission Appliances
  11. Testing & Commissioning
  12. On Completion
  13. Record Keeping/Health Monitoring

jsa-iauditor.png

We're here to help if you need us!

We give you support just call 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

Write your own product review

Product Reviews


  1. Best Yet

    Posted by on

    Set out in a easy to understand and read manner. LOVE the phone app it is exactly what I required. Top Job


$79.95

PLUS GST

View Cart


You May Also Need...