Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Air Conditioning (Electrical - Refrigerant Connection) SWMS 10572-3

Air Conditioning (Electrical - Refrigerant Connection) SWMS 10572-3

Product SKU: 10572
Air Conditioning (Electrical - Refrigerant Connection) SWMS 10572-3 Video

Other Details

PDF Download:
air_conditioning_electrical-refrigerant_connection_swms_10572-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Download via Email on order completion.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Instructions on customisation provided.
    • Complies with current legislation in all Australian States/Territories and New Zealand.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Air Conditioning (Electrical - Refrigerant Connection) SWMS | Safe Work Method Statement

This Air Conditioning (Electrical - Refrigerant Connection) Safe Work Method Statement (SWMS) outlines the safety steps, general hazards and controls associated with running refrigerant lines and electrical connection of air-conditioning system installations.

Job Steps covered in Air Conditioning (Electrical - Refrigerant Connection) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Assess On-site Conditions
  4. Work Area Set-up
  5. Running Refrigerant Lines
  6. Joining Refrigerant Lines
  7. Electrical Fit-off
  8. Commission Appliances
  9. Testing & Commissioning
  10. On Completion

jsa-iauditor.png

We're here to help if you need us!

We give you support just call 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...