Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Air Conditioning (Electrical - Refrigerant Connection) SWMS 10572-2

Air Conditioning (Electrical - Refrigerant Connection) SWMS 10572-2

Product SKU: 10572
Air Conditioning (Electrical - Refrigerant Connection) SWMS 10572-2 Video

Other Details

PDF Download:
air_conditioning_electrical-refrigerant_connection_swms_10572-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Air Conditioning - Electrical - Refrigerant Connection Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a pre-filled document that outlines the safety steps, general hazards and controls associated with running refrigerant lines and electrical connection of air-conditioning system installations.

Job Steps Covered in Air Conditioning - Electrical - Refrigerant Connection SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Work area set up
  5. Running refrigerant lines
  6. Joining refrigerant lines
  7. Electrical fit off
  8. Commission appliances
  9. Testing & Commissioning
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...