Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Air Conditioning (Existing Premises) SWMS 10573-3

Air Conditioning (Existing Premises) SWMS 10573-3

Product SKU: 10573
Air Conditioning (Existing Premises) SWMS 10573-3 Video

Other Details

PDF Download:
Air Conditioning (existing premises)_SWMS_10573-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Download via Email on order completion.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Instructions on customisation provided.
    • Complies with current legislation in all Australian States/Territories and New Zealand.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Air Conditioning (Existing Premises) SWMS | Safe Work Method Statement

This Air Conditioning (Existing Premises) Safe Work Method Statement (SWMS) outlines the generic safety steps, hazards and controls associated with the installation of ducted and split system air conditioning.

Job Steps covered in Air Conditioning (Existing Premises) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Assess On-site Conditions
  4. Work Area Set-up
  5. Materials Delivery
  6. Outdoor/Indoor Units
  7. Installing Ductwork & Refrigerant Lines
  8. Joining Refrigerant Lines
  9. Electrical Fit-off
  10. Commission Appliances
  11. Testing & Commissioning
  12. On Completion
  13. Record Keeping/Health Monitoring

jsa-iauditor.png

We're here to help if you need us!

We give you support just call 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...