Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Air Conditioning Installation (Split Systems - New Construction) SWMS 10565-3

Air Conditioning Installation (Split Systems - New Construction) SWMS 10565-3

Product SKU: 10565
Air Conditioning Installation (Split Systems - New Construction) SWMS 10565-3 Video

Other Details

PDF Download:
air_conditioning_split_systems-new_construction_swms_10565-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Download via Email on order completion.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Instructions on customisation provided.
    • Complies with current legislation in all Australian States/Territories and New Zealand.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Air Conditioning Installation (Split Systems - New Construction) SWMS | Safe Work Method Statement

This Air Conditioning Installation (Split Systems - New Construction) Safe Work Method Statement (SWMS) outlines the safety steps, general hazards and controls associated with new split system air-conditioning installation in buildings under construction.

Job Steps covered in Air Conditioning Installation (Split Systems - New Construction) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Assess On-site Conditions
  4. Work Area Set-up
  5. Lead In Via Slab
  6. Pipes, Drains, Conduit, Rough-in
  7. Mounting & Positioning Indoor & Outdoor Units
  8. Electrical Fit-off
  9. Commission Appliances
  10. On Completion

jsa-iauditor.png

We're here to help if you need us!

We give you support just call 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...