Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Air Conditioning Installation (Split Systems - New Construction) SWMS 10565-3

Air Conditioning Installation (Split Systems - New Construction) SWMS 10565-3

Product SKU: 10565
Air Conditioning Installation (Split Systems - New Construction) SWMS 10565-3 Video

Other Details

PDF Download:
air_conditioning_split_systems-new_construction_swms_10565-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Air Conditioning Installation Split Systems - New Construction Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is pre-filled with the safety steps, general hazards and controls associated with new split system air-conditioning installation in buildings under construction.

Job Steps Covered in Air Conditioning Installation Split Systems - New Construction SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Work area set up
  5. Lead in via slab
  6. Pipes, drains, conduit, rough-in
  7. Mounting and positioning indoor & outdoor units
  8. Electrical fit off
  9. Commission appliances
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...