Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Air Conditioning Installation (Split Systems - New Construction) SWMS 10565-3

Air Conditioning Installation (Split Systems - New Construction) SWMS 10565-3

Product SKU: 10565
Air Conditioning Installation (Split Systems - New Construction) SWMS 10565-3 Video

Other Details

PDF Download:
air_conditioning_split_systems-new_construction_swms_10565-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or SafetyCulture iAuditor to use this template

Air Conditioning Installation Split Systems - New Construction Safe Work Method Statement

This Safe Work Method Statement (SWMS) is pre-filled with the safety steps, general hazards and controls associated with new split system air-conditioning installation in buildings under construction.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Air Conditioning Installation Split Systems - New Construction SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services 
    • Involves a risk of a person falling more than 2m, including work on telecommunications towers
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Work area set up
    • Lead in via slab
    • Pipes, drains, conduit, rough-in
    • Mounting and positioning indoor & outdoor units
    • Electrical fit off
    • Commission appliances
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...