Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Air Conditioning (Service & Repairs) SWMS 10006-5

Air Conditioning (Service & Repairs) SWMS 10006-5

Product SKU: 10006
Air Conditioning (Service & Repairs) SWMS 10006-5 Video

Other Details

PDF Download:
air_conditioning_service_repairs_swms10006-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Download via Email on order completion.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Instructions on customisation provided.
    • Complies with current legislation in all Australian States/Territories and New Zealand.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Air Conditioning (Service & Repairs) SWMS | Safe Work Method Statement

This Air Conditioning (Service & Repairs) Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the service and repairs for air conditioning systems.

Job Steps covered in Air Conditioning (Service & Repairs) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Travel To/From & Between Sites
  4. Assess On-site Conditions
  5. Working On or Near Energised Electrical Installations or Services
  6. Refrigerant System Evacuation & Charging
  7. Servicing of Equipment
  8. Recovery, Recycling & Disposal of Refrigerants
  9. On Completion
  10. Record Keeping/Health Monitoring

jsa-iauditor.png

We're here to help if you need us!

We give you support just call 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...