Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Air Conditioning (Service & Repairs) SWMS 10006-5

Air Conditioning (Service & Repairs) SWMS 10006-5

Product SKU: 10006
Air Conditioning (Service & Repairs) SWMS 10006-5 Video

Other Details

PDF Download:
air_conditioning_service_repairs_swms10006-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials

 

Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Air Conditioning (service & repairs) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the service and repairs for air conditioning systems.  Job Steps Covered in Air Conditioning (service & repairs) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to from & between sites
  4. Assess onsite conditions
  5. Working on or near Energised Electrical Installations or Services
  6. Refrigerant system evacuation and charging
  7. Servicing of equipment
  8. Recovery, recycling and disposal of refrigerants
  9. On Completion
  10. Record Keeping/ Health Monitoring

 

godigital-digitaljsa-bannerforswmspages-v3.png

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...