Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Antenna - Satellite Dish Installation SWMS 10

Antenna - Satellite Dish Installation SWMS 10

Product SKU: 10009
Antenna - Satellite Dish Installation SWMS 10 Video

Other Details

PDF Download:
AntennaSatellite_Dish_Installation_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or SafetyCulture iAuditor to use this template

Antenna - Satellite Dish Installation Safe Work Method Statement

This Safe Work Method Statement (SWMS) covers the general safety steps, hazards and controls associated with the installation of Antenna’s and Satellite dishes on a roof. This includes working at height, harness use, power tools, electrical installation and equipment installation.

This SWMS does not cover the specific setup of height access equipment. A dedicated SWMS will be required for the set-up/erection of height access equipment such as Mobile and Fixed Scaffolds, Mobile Elevated Work Platforms, edge protection etc.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Antenna - Satellite Dish Installation SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Involves a risk of a person falling more than 2m, including work on telecommunications towers
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Materials Delivery
    • Work Area Setup 
    • Lifting material onto roof
    • Fixing equipment to roof (e.g. Antenna)
    • Running cables (ceiling spaces)
    • Run and install cable outlets in wall
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...