Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Antenna - Satellite Dish Installation SWMS 10009-6

Antenna - Satellite Dish Installation SWMS 10009-6

Product SKU: 10009
Antenna - Satellite Dish Installation SWMS 10009-6 Video

Other Details

PDF Download:
antenna-satellite_dish_installation_swms10009-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Antenna-Satellite Dish Installation Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) covers general aspects associated with installation of Antenna’s and Satellite dishes on a roof. This includes working at height, harness use, power tools, electrical installation and equipment installation. 

This SWMS does not cover the specific setup of height access equipment. A dedicated SWMS will be required for the set-up/erection of height access equipment such as Mobile and Fixed Scaffolds, Mobile Elevated Work Platforms, edge protection etc.

Job Steps Covered in Antenna-Satellite Dish Installation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & site assessment
  4. Work area set up
  5. Blasting
  6. Coating
  7. On Completion
  8. Record Keeping/ Health Monitoring
 
godigital-digitaljsa-bannerforswmspages-v3.png
   
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...