Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Asbestos (Licensed Removal) SWMS 10010-6

Asbestos (Licensed Removal) SWMS 10010-6

Product SKU: 10010
Asbestos (Licensed Removal) SWMS 10010-6 Video

Other Details

PDF Download:
Asbestos (licensed removal) SWMS 10010-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Download via Email on order completion.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Instructions on customisation provided.
    • Complies with current legislation in all Australian States/Territories and New Zealand.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Asbestos (Licensed Removal) SWMS | Safe Work Method Statement

This Asbestos (Licensed Removal) Safe Work Method Statement (SWMS) provides guidance on working with and removal of friable or non-friable asbestos greater than 10m2 in area (licence required).

  • Non-friable asbestos means material containing asbestos that is not friable asbestos, including material containing asbestos fibres reinforced with a bonding compound. Common examples: cement sheeting, ceiling tiles, vinyl tiles. 

  • Friable asbestos means material that is in a powder form or that can be crumbled, pulverised or reduced to a powder by hand pressure when dry, and contains asbestos. Examples include: pipe lagging, limpet and fire door cores. (Codes of Practice: Safe Work Australia (2011): How to safely remove asbestos.)

Job Steps covered in Asbestos (Licensed Removal) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Assess On-site Conditions
  4. Prepare The Work Area
  5. Enter Contaminated Area/Removal Site
  6. Asbestos Removal
  7. Exit Contaminated Area/Removal Site
  8. Asbestos Removal Control Plan
  9. On Completion
  10. Record Keeping/Health Monitoring

jsa-iauditor.png

We're here to help if you need us!

We give you support just call 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...

 


Product Videos

Asbestos (02:21)
Asbestos is a fibrous mineral that's resistant to chemicals and heat, and very tough. It was also added to the building materials of many older homes. As a worker or homeowner, the hazard exists when undertaking a renovation or demolition. The danger is releasing asbestos fibres into the air. When a worker breathes, asbestos fibres enter the mouth and nose and flow down the air passages deep into the lungs. The fibres lodge in the delicate lung tissue where oxygen is absorbed into the blood. Immune system cells try and break down the asbestos fibres and become damaged and die. Scar tissue forms around the dead cells and spread as more fibres imbed in the lungs. Asbestos fibres can remain in the lungs for long periods and the scar tissue that results continues to develop for many years after exposure. Eventually, so much scar tissue develops that the lungs stop working.
  • Asbestos
    Asbestos is a fibrous mineral that's resistant to chemicals an...