Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Asbestos (Licensed Removal) SWMS 10010-4

Asbestos (Licensed Removal) SWMS 10010-4

Product SKU: 10010
Asbestos (Licensed Removal) SWMS 10010-4 Video

Other Details

PDF Download:

  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • SWMS suitable for NSW, QLD, SA, TAS, NT & ACT only
  • SWMS includes Asbestos Removal Control Plan
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • You must have Microsoft Word or iAuditor to use this template

Asbestos – Licensed Removal Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated working with and removal of friable or non-friable asbestos greater than 10 m2 in area (licence required).

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Asbestos – Licensed Removal SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Asbestos
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Prepare the work area
    • Enter contaminated area/removal site
    • Asbestos removal
    • Exit contaminated area/removal
    • On Completion
  • Asbestos Removal Control Plan
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  


app-store-badge.png       google-play-badge.png


For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!



View Cart

You May Also Need...


Product Videos

Asbestos (02:21)
Asbestos is a fibrous mineral that's resistant to chemicals and heat, and very tough. It was also added to the building materials of many older homes. As a worker or homeowner, the hazard exists when undertaking a renovation or demolition. The danger is releasing asbestos fibres into the air. When a worker breathes, asbestos fibres enter the mouth and nose and flow down the air passages deep into the lungs. The fibres lodge in the delicate lung tissue where oxygen is absorbed into the blood. Immune system cells try and break down the asbestos fibres and become damaged and die. Scar tissue forms around the dead cells and spread as more fibres imbed in the lungs. Asbestos fibres can remain in the lungs for long periods and the scar tissue that results continues to develop for many years after exposure. Eventually, so much scar tissue develops that the lungs stop working.
  • Asbestos
    Asbestos is a fibrous mineral that's resistant to chemicals an...