Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Asbestos (Licensed Removal) SWMS - VICTORIA ONLY 10551-2

Asbestos (Licensed Removal) SWMS - VICTORIA ONLY 10551-2

Product SKU: 10551
Asbestos (Licensed Removal) SWMS - VICTORIA ONLY 10551-2 Video

Other Details

PDF Download:
asbestos_licensed_removal_victoria_swms_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Asbestos - Licensed Removal Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document that provides guidance on working with and removal of friable or non-friable asbestos greater than 10 m2 in area (licence required). This SWMS includes an Asbestos Removal Control Plan (ARCP)

This SWMS is suitable for Victorian businesses only.

Job Steps Covered in Asbestos - Licensed Removal SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Prepare the work area
  5. Enter contaminated area/removal site
  6. Asbestos removal
  7. Exit contaminated area / removal site
  8. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...