Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Asbestos (Safe Handling) SWMS 10388

Asbestos (Safe Handling) SWMS 10388

Product SKU: 10388
Asbestos (Safe Handling) SWMS 10388 Video

Other Details

PDF Download:
asbestos_safe_handling_swms_10.1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Suitable for NSW, QLD, SA, TAS, NT and ACT only
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Asbestos - Safe Handling Safe Work Method Statement

This SWMS provides guidance on working with or removing small amounts non-friable asbestos less than 10 m2 in area. (No licence required). This SWMS should be used for minor work in which asbestos or asbestos-containing materials (ACM) are encountered in the workplace. Examples may be drilling into, painting or replacing a small section of non-friable asbestos sheeting wall or removing non-friable asbestos lagging for a pipe repair. This SWMS does not cover the removal of friable asbestos, or non-friable asbestos greater than 10sqm, or working with asbestos friction materials such as brake pads. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Asbestos - Safe Handling SWMS Content: 

  • High Risk Construction Work
    • Asbestos
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Prepare the work area
    • Removing small sections (<10sqm) of ACM, i.e. asbestos wall cladding, roofing materials etc.
    • Drilling asbestos
    • Paint / repaint ACM
    • Disposing of asbestos waste
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...