Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Audio Visual (AV Installation) SWMS 10014-6

Audio Visual (AV Installation) SWMS 10014-6

Product SKU: 10014
Audio Visual (AV Installation) SWMS 10014-6 Video

Other Details

PDF Download:
audio_visual_av_installations_swms_10014-6__66864.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Download via Email on order completion.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Instructions on customisation provided.
    • Complies with current legislation in all Australian States/Territories and New Zealand.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Audio Visual (AV Installation) SWMS | Safe Work Method Statement

This Audio Visual (AV Installation) Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with installation of audio visual equipment such as Video Conferencing, Audio & PA Systems, Digital Signage and Home Theatre Systems.

Covered in this SWMS is cable and lead installation, manual handling, hazardous materials, working in ceilings and working on ladders.

Job Steps covered in Audio Visual (AV Installation) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Assess On-site Conditions
  4. Materials Delivery
  5. Work Area Set-Up
  6. New Equipment - Electrical Testing
  7. Running Cables/Set-Up Equipment Brackets/Supports
  8. Lifting, Mounting & Installing AV Components into Position
  9. Test AV Equipment is Functional
  10. On Completion
  11. Record Keeping/Health Monitoring

jsa-iauditor.png

We're here to help if you need us!

We give you support just call 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...