Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Audio Visual (AV Installation) SWMS 10014-6

Audio Visual (AV Installation) SWMS 10014-6

Product SKU: 10014
Audio Visual (AV Installation) SWMS 10014-6 Video

Other Details

PDF Download:
audio_visual_av_installations_swms10014-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Audio Visual (AV Installation) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with installation of audio visual equipment such as Video Conferencing, Audio & PA Systems, Digital Signage and Home Theatre Systems. Covered in this SWMS is cable and lead installation, manual handling, hazardous materials, working in ceilings and working on ladders.

Job Steps Covered in Audio Visual (AV Installation) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Materials delivery
  5. Work area set up
  6. New equipment - electrical testing
  7. Running cables/setting up equipment brackets / supports
  8. Lifting, mounting & installing AV components into position
  9. Test AV equipment is functional
  10. On Completion
  11. Record Keeping/ Health Monitoring

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...