Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Awnings/Blinds/Curtains Installation SWMS 10147-6

Awnings/Blinds/Curtains Installation SWMS 10147-6

Product SKU: 10147
Awnings/Blinds/Curtains Installation SWMS 10147-6 Video

Other Details

PDF Download:
awnings_blinds_curtain_installation_swms_10147-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Download via Email on order completion.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Instructions on customisation provided.
    • Complies with current legislation in all Australian States/Territories and New Zealand.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Awnings/Blinds/Curtains Installation SWMS | Safe Work Method Statement

This Awnings/Blinds/Curtains Installation Safe Work Method Statement (SWMS) outlines general issues associated with installation of window accessories such as awnings, blinds and curtains – both exterior and interior works.

This SWMS includes installation works on construction sites and existing domestic dwellings.

Job Steps covered in Awnings/Blinds/Curtains Installation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Assess On-site Conditions
  4. Work Area Set-up
  5. Install Mounting Brackets/Hardware
  6. Mounting Canopy/Blind/Rod/Curtain and Cords/Chains
  7. On Completion

jsa-iauditor.png

We're here to help if you need us!

We give you support just call 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...